The Neutron Bridge

At INEF 2026 I realised how little the fission and fusion communities still talk to each other. Yet a fusion device is, before it is ever a power plant, an intense source of fast neutrons — and that surplus can breed U-233 from India’s thorium, burn long-lived waste, and drive a sub-critical hybrid that never goes critical. Fission problems with a fusion answer.

The Neutron Bridge — Part 1 | Prof. Prabhat Ranjan

I spent two days at the India Nuclear Energy Forum at IIT Bombay this May, and I came away with one impression more strongly than any other. The people who build and run our fission plants — some of the most capable nuclear engineers anywhere — have, for entirely understandable reasons, not been watching what has happened in fusion over the last five or six years. And the fusion community, equally guilty, has rarely bothered to explain itself in terms a reactor physicist would find useful.

That is a shame, because the two fields are closer to needing each other than either side seems to realise. I want to use this note to close a little of that gap, written deliberately for colleagues who think in cross-sections and neutron budgets rather than press releases.

What changed in fusion while you were busy keeping the grid running

For most of our careers, “fusion” meant one thing: a very large tokamak, decades away, funded by governments. ITER is real and important, but it shaped a perception that fusion is monolithic and remote. That perception is now out of date in two specific ways.

First, the magnet problem has largely been solved by materials, not by scale. High-temperature superconductors — REBCO tapes in particular — let us reach the field strengths that used to require enormous low-temperature magnets, in machines a fraction of the size. A high field at a small radius changes the entire economic argument, because confinement and reaction rate scale steeply with field. This is why the credible new private programmes are an order of magnitude smaller than ITER and still expect meaningful performance.

Second, and more relevant to this audience, the field has rediscovered configurations the fission community would find refreshingly simple. I work on the axisymmetric magnetic mirror — the Gas Dynamic Trap lineage from Budker Institute in Novosibirsk, recently validated by the WHAM experiment at Wisconsin and its commercial successor. A linear mirror is not a closed toroidal device. It is, conceptually, a long straight magnetic bottle. It is easier to build, easier to maintain, and — crucially — it is an excellent neutron source even when its energy gain is modest. Hold that last point; it is the whole argument.

The deeper shift is one of intent. A generation of fusion programmes asked only one question: when do we put electricity on the grid? The newer programmes ask a different one first: what is fusion good for before it is a power plant? And the honest answer is that a fusion device is, first and foremost, a controllable, intense source of fast neutrons. That reframing is what should interest you.

Why a fusion neutron is different

A deuterium–tritium reaction releases 17.6 MeV, of which 14.1 MeV leaves as a neutron. Compare that with the roughly 2 MeV average of a fission neutron. The factor of seven in energy is not a curiosity — it opens reaction channels that are simply closed to a thermal or even a fast fission spectrum.

Energy comparison of a fission neutron at about 2 MeV and a D–T fusion neutron at 14.1 MeV, showing the high-energy reaction channels — (n,2n) multiplication and fast fission of minor actinides — that only the fusion neutron reaches.
The fusion neutron is born about seven times more energetic than a fission neutron, clearing the thresholds for neutron multiplication and hard-spectrum fission that a reactor spectrum cannot.

At 14 MeV you get neutron multiplication almost for free. Inelastic and (n,2n) channels in beryllium and lead mean a blanket can return more neutrons than it receives. That surplus is the resource. In a critical reactor every neutron is spoken for — you live or die by the six-factor formula and you have almost no margin to spend neutrons on anything that does not sustain the chain. A fusion source hands you a neutron budget you do not have to balance against criticality.

What you choose to do with that surplus — breed fuel that has eluded our thorium programme for decades, burn the waste that fills our repositories, and generate power without the assembly ever going critical — is exactly where our two fields meet.

Continue reading “The Neutron Bridge”

Viksit Bharat Needs Firm Power: Why Fusion Must Be in India’s Energy Plan Now

India’s electricity demand will nearly quadruple by 2047. Solar and wind cannot carry that load alone. The time to build the next generation of baseload is not 2040 — it is today and why fusion must be a strong part of it.

India’s electricity demand will nearly quadruple by 2047. Solar and wind cannot carry that load alone. The time to build the next generation of baseload is not 2040 — it is today.


Disclosure: The author is co-founder of ASPL Fusion, a private Indian fusion company. This article presents an industry perspective on national energy policy. The policy arguments are grounded in publicly available data; the ASPL programme description in Section 5 is provided as a concrete illustration of what a domestic fusion development path can look like in practice.

At a Glance — For Decision-Makers

708 GW peak demand and 2,100 GW total capacity needed by 2047 — the equivalent of building a new US power grid from scratch.

Intermittent renewables alone cannot provide firm power — grid stability requires large-scale dispatchable baseload even with abundant storage.

Fusion now has serious private capital behind it: Microsoft, Google, and OpenAI are structuring power purchase agreements with fusion companies. India risks being a technology importer.

Three budget-cycle asks for 2026: fusion in National Energy Plan · dedicated component development fund · AERB regulatory engagement mandate.

Key Number

India’s Central Electricity Authority projects peak power demand reaching 708 GW by 2047 — four times today’s installed capacity. Meeting it requires 2,100 GW of generation: close to the entire current installed capacity of the US and EU combined. That is the scale of infrastructure build India must manage across the next two decades.

Continue reading “Viksit Bharat Needs Firm Power: Why Fusion Must Be in India’s Energy Plan Now”